Skip to the quote form
Panel Upgrade Cost
Main panel upgrades · Orange County

One hundred amps isn't enough anymore

Your house was wired for a stove and a furnace. A permitted 200-amp service means the EV, the heat pump, and the air conditioning stop fighting each other.

$2,500 – $6,500 typical Orange County 200A upgrade, permit included
1,500+Panels upgraded
98%Pass first inspection
10 yrWorkmanship warranty
An electrician terminating conductors inside an open 200-amp panel.
Fullerton · install day
A combination meter and main breaker panel on an exterior wall.
Anaheim
A finished 200-amp service panel outside a home at dusk.
Orange
Licensed & insured · CSLB #000000 Permit pulled and inspection met Fixed price before we start 4.9 average · 240 reviews
200AStandard service we install
40Breaker slots, room to grow
4–8 hrsPower off, one day only
2–3 wksCall to final sign-off
What it costs

The number, before you pick up the phone

Most sites make you book a visit to hear a price. Here is the honest range for a 100-amp to 200-amp service upgrade in Orange County, and the things that move it up or down. Your fixed quote comes after a free 45-minute assessment — no allowances, no day-of surprises.

Straightforward 200A upgrade Panel swaps in the same spot, mast and meter in good shape $2,500 – $4,000
Upgrade with a new service mast Weatherhead, riser or mast is corroded or undersized $4,000 – $5,500
Relocation or meter-main combination Panel moves, or the utility requires a combination unit $5,000 – $6,500
City electrical permit Included in every quote — never billed to you separately $100 – $300

Ranges reflect typical Orange County pricing for a full 200-amp service upgrade. Your quote is fixed in writing after the assessment and does not change unless you change the scope.

What the price includes

  • New 200A main breaker panel
  • Grounding and bonding brought to code
  • Permit filing and the inspection appointment
  • Utility disconnect and reconnect scheduling
  • Typed circuit directory on the door
  • 10-year workmanship warranty
  • Drywall repair, if the panel moves indoors
  • Rewiring existing branch circuits
Scope

Everything on our board

Open any panel door and you'll find a hand-written index of what each breaker feeds. This is ours — the work we take on, and the work we'll quote you separately for.

Not sure which line you're on?

Send a photo of your panel door and your zip code. We'll read the label, tell you what service you have now, and say plainly whether you need an upgrade — before anyone visits.

Send a panel photo
Danger
Circuit directory 200A · 40 slots
01Main panel upgrade, 100A to 200A
02Federal Pacific & Zinsco replacement
03Meter main combination units
04Grounding & bonding to code
05Permit filing & city inspection
06Utility disconnect scheduling
07Level 2 EV charger circuits
08Heat pump & AC circuits
09Garage & ADU sub-panels
10Service mast replacement
11Whole-home surge protection
12Typed directory on every door
Sequence

How a panel upgrade actually goes

The permit is the slow part. The work itself is a single day, and you get your power back the same afternoon.

01

Load assessment

We read your panel, count the circuits, and calculate what your household actually draws against what the service can carry.

45 min · free
02

Fixed quote

Panel, labour, permit, and utility coordination in one number. If your mast needs work, you see it before you sign.

Within 48 hours
03

Permit & utility

We file with your city and book the utility to pull the meter on install morning. Municipal utilities need more notice.

1–2 weeks
04

Install & sign-off

New panel, new grounding, typed directory on the door. Inspector comes within the week and we meet them there.

4–8 hours on site
Field notes

From a job in Anaheim

A combination meter and main breaker panel mounted on the exterior wall of a house in Anaheim.
“Our insurer sent a non-renewal letter over the old Zinsco panel. They pulled the permit, dealt with the city and the utility, and had it swapped in a day. We sent the sign-off to the insurer and the policy went through.”
Homeowner, Anaheim1953 build · 100A to 200A upgrade Placeholder testimonial — replace before launch
Questions

The things everyone asks

If yours isn't here, ask it on the form and we'll answer before we ever talk about scheduling.

How much does a main panel upgrade cost?

In Orange County, a 100-amp to 200-amp service upgrade typically runs $2,500 to $6,500, including the city electrical permit. A straightforward swap in the same location sits at the low end. A new service mast, a panel relocation, or a utility-required meter-main combination moves it toward the top. You get a fixed written number after a free 45-minute assessment.

How long will my power be off?

Four to eight hours on install day, and you get power back the same afternoon. The whole project runs two to three weeks from your first call to final inspection sign-off — the permit is the slow part, not the work.

Do I actually need 200 amps, or is 100 fine?

If you are not adding load and nothing is tripping, 100 amps may be fine. You likely need the upgrade if you are adding a Level 2 EV charger, a heat pump, or central air; if your panel is full and has no room for another breaker; or if your insurer has flagged the panel. The free assessment includes a load calculation, and if the honest answer is that you don't need an upgrade, we will tell you that.

My panel is a Federal Pacific or a Zinsco. Is that urgent?

These panels are known to fail to trip under fault conditions, which is why many insurers will not renew a policy while one is installed. Replacement is the accepted fix — swapping individual breakers does not solve it. If you have one, treat it as the reason to move now rather than later.

Do you handle the permit and the city inspection?

Yes. We file the electrical permit with your city, schedule the utility to pull and reset the meter, and meet the inspector on site. You do not call city hall, and the permit fee is inside your quoted price rather than added afterwards.

Will my quote change on install day?

No. The number in your written quote is fixed and covers the panel, labour, permit, and utility coordination. The only way it moves is if you change the scope — for example, adding an EV charger circuit while we are already there. Anything we find during the assessment, such as a corroded mast, is priced before you sign, not after.

Are there rebates for a panel upgrade?

Mostly not, as of 2026. SGIP closed its ratepayer-funded budgets at the end of 2025 and TECH Clean California closed single-family reservations in November 2025. SCE's Charge Ready Home program is still open for panel upgrades but is income-qualified, so most Orange County homeowners will not qualify. We will not quote you a rebate we have not confirmed is live that week.

What happens after I submit the form?

A person reads it, usually within the hour during business hours. If you sent a photo of your panel door we will tell you what service you have now and whether you need an upgrade at all — by text or email, whichever you chose. Only then do we talk about booking the free assessment. There is no obligation and no deposit at any point before you sign a written agreement.

Free assessment

Find out what yours costs

Three short steps. Nothing on the first two identifies you, and we only ask for contact details once you have told us what you need.

Step 1 of 3

What do you need?

No contact details yet — this just tells us which job it is.

The work
Pick the one closest to your situation.
Service size you have now
Choose one — "I don't know" is a perfectly good answer.
Enter a 5-digit zip code.

Request received

A person will read this and get back to you with a real range — usually within the hour during business hours. Nothing is scheduled and nothing is owed.

Still just pricing it out?

Send a photo of your panel door and a zip code. We'll tell you what you have and what it would take — no visit required.

Call now Get my quote